Risk trajectory
Expected annual loss. The forecast follows the order of the planned projects.
Track expected loss from one review to the next, and show what the security program has removed. Then forecast how much loss future projects, or any scenario you test, would remove.
Your first result is a DeRISK™ CRQ estimate for your company, built from public data. Level 3 Board-Grade tracks it over time. The DeRISK Consultant adds the forward line, and the DeRISK Scenario Simulator tests a scenario before you commit.
Expected annual loss. The forecast follows the order of the planned projects.
Progress gets reported as activity: projects closed, scores nudged. The board is asking about risk.
The same model runs at every review, in the framework you report to. Each run adds a point to the line. Planned projects and tested scenarios show where it could go next.
Run the first assessment: an expected annual loss with bad-year (1-in-20) and severe-year (1-in-100) figures. It is the point every later review compares against.
Example company. The baseline: $18.4M expected annual loss, with the curve behind it.
Re-run it at each monthly or quarterly review, the same cadence as executive reporting. Answer in the framework you already report to. Each run adds a point to the line and shows which control areas moved.
By control area
Overall 2.0 of 4.0, Developing.
By security layer
Overall 2.0 of 4.0, Developing.
By foundational requirement
Overall 2.0 of 4.0, Developing.
Example company. Control scores in the framework you pick: the DeRISK Control Model, NIST SP 800-82r3 or IEC 62443.
Add the next projects, each ranked by the loss it removes. The forecast shows where the line could go as each one is done. In the example, three projects would take $18.4M to $11.1M.
Example company. The next projects in order, with the loss each one removes.
Compose a what-if: the threat, the site, the entry point and the controls in place. See what it would cost as is and with a planned change, before you fund it. In the example, MFA on remote access takes one plant’s expected loss from $2.4M to $1.5M a year.
Comparing
Expected loss / yr
Tail loss
Saved scenarios
Example scenario. Ransomware through remote access at one plant, as is and with MFA.
The probability of a loss (frequency) and its severity (magnitude), over thousands of simulated years.
A typical year, a bad year and a severe year, each with its own figure.
The report lists its assumptions and limitations.
See the inputs behind the number, and overrule the ones you know better.
Level 1 and Level 2 are free and need no OT data. Level 3 Board-Grade is where the trend starts, with the same model at every review. The DeRISK Consultant adds the forward line, and the DeRISK Scenario Simulator tests scenarios.
Add-ons start here
Create a free account. The Level 1 Estimate and Level 2 Baseline are free. They give a company-level expected annual loss and a company report, with no OT network data needed. Level 3 Board-Grade adds the five executive reports and the trend over time, and opens the add-ons that project the line forward and test scenarios.
No credit card. No OT network data needed to start.