Risk quality evidence
Control maturity by NIST SP 800-82r3 layer, 2.0 of 4.0 overall, with confidence stated.
Send your insurer modeled loss and control evidence with the application. The underwriter then prices the risk you actually carry.
Your first result is a DeRISK™ CRQ estimate built from public data, the first piece of the package. DeRISK never fills in the insurer’s questionnaire. The package goes with it.
Control maturity by NIST SP 800-82r3 layer, 2.0 of 4.0 overall, with confidence stated.
Security, operations and finance each hold a piece of the evidence. The underwriter sees only the form.
The same model runs at every level. Each new run refreshes the package, so it is current at every renewal.
Bring the modeled loss picture, a check of each loss against annual revenue, and the risk quality evidence behind it. Together they show the underwriter the loss you carry and the controls that shape it.
Example company. Expected annual loss of $18.4M, up to $64M (3.5% of annual revenue) in a 1-in-20 year and up to $112M (6.1%) in a 1-in-100 year.
Break the number into the scenarios that drive it, by cost type. The underwriter sees what sits inside the loss and where your controls change it.
What the expected annual loss is made of.
Example company. The scenarios behind the number, by cost type.
Show the loss removed since the last renewal and the projects you commit to over the policy year. The timeline marks each renewal, so every one shows what changed since the one before.
Assessed: $23.0M at the last renewal, $18.4M now, down $4.6M.
Forecast: $14.3M if project 1 lands before the renewal; $11.1M once all three are done.
Example company. Done since the last renewal, and planned over the next policy year on your own dates.
More exhibits that go with the application: loss against revenue, control maturity by plant and the biggest scenarios. Shown from the Chief Risk Officer, COO and CEO & Board sample reports.
Loss as a share of annual revenue, against thresholds you set.
| Plant | Firewalls | Malware prevention | Vulnerabilities | Access controls | Detection | Incident response | Backups | Average |
|---|---|---|---|---|---|---|---|---|
| Houston | 1.0 | 2.0 | 1.5 | 1.5 | 2.0 | 2.0 | 1.5 | 1.6 |
| Baton Rouge | 2.0 | 2.5 | 1.5 | 2.0 | 1.5 | 2.0 | 1.5 | 1.9 |
| Chicago | 2.5 | 2.5 | 2.0 | 2.5 | 2.0 | 2.0 | 2.5 | 2.3 |
| Pittsburgh | 2.5 | 2.0 | 2.0 | 2.0 | 2.0 | 1.5 | 2.5 | 2.1 |
| Tulsa | 1.5 | 1.5 | 1.0 | 1.5 | 1.0 | 1.0 | 1.5 | 1.3 |
Scale 0 to 4; lighter is weaker. Tulsa scores weakest, but Houston carries more loss: rank by loss, not by score. Also available in IEC 62443, NIST SP 800-82r3 or the DeRISK Control Model.
Each scenario’s own 1-in-100 year loss.
The probability of a loss (frequency) and its severity (magnitude), over thousands of simulated years.
A typical year, a bad year and a severe year, each with its own figure.
The report lists its assumptions and limitations.
See the inputs behind the number, and overrule the ones you know better.
Level 1 and Level 2 are free and need no OT data. Level 3 Board-Grade builds the package. Level 4 Evidence-Grade adds evidence from facility OT network data, beyond self-reported answers.
Add-ons start here
Create a free account. The Level 1 Estimate and Level 2 Baseline are free. They give a company-level expected annual loss and a company report, with no OT network data needed. Level 3 Board-Grade adds the five executive reports and opens the add-ons.
No credit card. No OT network data needed to start.