DeNexus for Data Centers

Quantify OT cyber risk across every data center campus

The DeRISK™ Intelligence Platform gives the power, cooling and building systems at every campus an Expected Annual Loss, even without OT network data, so you know where downtime costs most.

Data center server hall
Colocation · Facilities$3.6M EAL
Hyperscale data center campus
Hyperscale · Campuses$7.8M EAL
Rooftop cooling units at an edge site
Capacity at risk · Megawatts28 MW

Most operators can't say what an hour of OT downtime would cost

Power, cooling and building management systems are OT. When they fail, the loss is counted in revenue per hour, not in records.

Campuses where IT meets OT

Power distribution, cooling and BMS run on industrial controllers, often managed by third parties, with little OT network monitoring.

One incident, many kinds of loss

Downtime, SLA credits, damaged power and cooling equipment and recovery hit at once. The DeRISK Consequence Model counts each cost exactly once.

A color can't be budgeted

Boards, regulators and insurers need a number. A heat map can't go into a budget or a renewal; an Expected Annual Loss can.

Quantify, reduce and transfer
OT cyber risk in data centers

Put a dollar figure on every campus, from cooling plant to power feed

DeRISK™ CRQ quantifies OT cyber risk site by site and rolls it up to the portfolio, so the board, the CFO and the CISO work from the same Expected Annual Loss.

  • Expected Annual Loss, Value at Risk and loss exceedance (OEP/AEP), site by site and across the portfolio
  • A 50-question assessment in the DeRISK Control Model, NIST SP 800-82r3 or IEC 62443
  • Five role-based reports at Level 3 Board-Grade, from the Cyber Risk Brief to the Risk Transfer Evidence Bundle

Built around how data centers actually run

  • DeRISK™ CRQ models your portfolio the way you run it: hyperscale campus and colocation site, cooling plant to power feed.
  • Each site’s Expected Annual Loss traces to the losses that matter here: lost capacity in megawatts, megawatt-hours of downtime, damaged power and cooling equipment.
  • Every site rolls up into one portfolio view your CFO and insurers read the same way.

Featured Data Center Resources

View all
Cover of the methodology paper Quantifying OT Cyber Risk: Where FAIR Stops ShortMethodology paper · 20 min read

Quantifying OT Cyber Risk: Where FAIR Stops Short

How FAIR applies in OT environments, where it stops short, and how DeNexus carries the analysis through to the plant floor.

Read the paperDownload the PDF
Sample report page on the cover of the paper OT Cyber Risk in Production DaysRole paper · COO & Operations

OT Cyber Risk in Production Days

Read the paper →
Sample report page on the cover of the paper Prioritizing OT Security by Expected LossRole paper · CISO, CIO, CSO, and Cyber

Prioritizing OT Security by Expected Loss

Read the paper →
Sample report page on the cover of the paper OT Cyber Risk in the BoardroomSample report · CEO & Board · PDF

Cyber Risk Brief

Download the PDF →

Put a number on data center OT risk, not a score.

Get a company-level estimate free, from cooling plant to power feed, without connecting anything to your OT network. Or walk through a facility-level assessment with our team.

No credit card. No OT data integration required.